M/V Mol Efficiency - repair of rudder arrangement
Back to case overview
70 m2 and 64 tonnes heavy rudder arrangement was send to Hirtshals for major renovation incl. the manufacturing of a new 7.6 m rudder stock, 2 new stainless steel sleeves etc. Rudder stock was fitted to the rudder and tiller. Due to its width, the rudder was sailed to Hirtshals. The job was classed by ABS.